| With the building industry being hit hard during the | | | | return for the huge upfront savings and lower |
| recession the launch of Aganto’s Part L2A | | | | maintenance requirements contractors can offer their |
| Compliant Range could not have come at a better | | | | clients. |
| time. Building contractors can now present their | | | | Solution not competition |
| clients with an alternative option that will help kick | | | | It would be understandable for the building industry |
| start some of the recession hit commercial and public | | | | to think of the new Part L2A Aganto Range as |
| sector projects. | | | | competition, but this is not the case. Aganto are |
| What’s all the fuss about? | | | | launching this Range into the building industry only. |
| Green, energy, efficiency, environment! That’s | | | | Clients who come to Aganto first for a Part L2A |
| where we are all going, like it or not. Aganto can now | | | | building would 9 times out of 10 require a building |
| fit into this ‘green’ box with the Part L2A | | | | contractor to manage the project. |
| Range meeting the stringent Building Control | | | | What exactly are the benefits? |
| requirements for air-tightness and energy efficiency. | | | | The simple modular design and a build process of |
| The fact they can do this, but retain minimal costs | | | | anchoring to the ground as opposed to traditional |
| without scrimping on quality or longevity, is simply | | | | foundations dramatically reduces labour costs and |
| what the fuss is about. | | | | build times. This means contractors are not only able |
| Designed to work not wow! | | | | to minimalise their clients’ costs, but offer a |
| It wouldn’t be unfair to say that, on occasion, | | | | complete solution in weeks as opposed to months. |
| the building industry has being slightly disparaging | | | | Fit for which purpose? |
| when it comes to temporary demountable buildings. | | | | Any heated building in use for more than two years |
| There are some valid points particularly in terms of | | | | now needs to meet Part L2A of Building Regulations. |
| aesthetics. They aren’t an architectural | | | | For non-dwelling purposes the Aganto Part L2A |
| masterpiece and wouldn’t win any prices for | | | | Range would be suitable for workshops, factories, |
| design and creativity. They are what they are, a | | | | educational facilities, warehousing space, gyms, halls |
| simple, easy, affordable and highly credible building | | | | and general open space public facilities. |
| solution for industrial, commercial and public sector | | | | Conclusion |
| usage; one that does also meet the same structural | | | | The pros of the Part L2A Compliant Range clearly |
| integrity standards as a permanent building. | | | | out weigh the cons. Although there is a lack of |
| Now, with the launch of the Aganto Part L2A | | | | contemporary architectural design, the quality and |
| Complaint Range temporary buildings have moved up | | | | strength is clearly evident. Additionally, the savings in |
| a notch and are presenting themselves as a true and | | | | terms of costs and time are so attractive and timely, |
| invaluable solution to building contractors for more | | | | the building industry could do a lot worse than adding |
| permanent applications. In the current recession the | | | | this range to their portfolios. |
| lack of design aesthetics is a small price to pay in | | | | |